Horizontal silo

GET INSTANT QUOTE

    FEATURES

    Product Details

    Description

    working principle:

    1. After the storage bin is fixed, the cement is transported to the construction site by the bulk cement truck, then the transmission pipeline of the bulk cement truck is connected with the feed pipeline of the cement bin (cement tank), and the cement in the tank is transmitted to the cement bin (cement tank) through the gas pressure of the bulk cement truck.

    2. In the process of conveying cement to the storage bin, the operator continuously presses the button of the vibration motor of the dust collector to shake off the cement attached to the cloth bag of the dust collector to prevent blocking the cloth bag and bin explosion.

    3. Once the cloth bag is blocked and the pressure in the warehouse exceeds the pressure of the pressure valve on the top of the warehouse, the pressure valve can be opened to release the pressure in the warehouse to prevent warehouse explosion.

    4. Through the high and low material levels, it can be observed that the warehouse is full and short.

    5. When discharging is required, the manual discharge valve at the bottom of the cone shall be opened first, and then the cement shall be transported out through the cement conveyor (screw conveyor).

    matters needing attention

    1). Check the horizontal cement tank before commencement. Before starting the cement tank, check each controller to see whether it is good and reliable. After shutdown, pour water and stones into the mixing drum for 10-15 minutes, and then clear the objects in the tank. During cleaning, it should be noted that the electric switch must be closed and guarded by a specially assigned person.

    2). Cleaning method of horizontal cement tank. It is necessary to clean the cement tank regularly, but most users do not master the skills during cleaning, and the cement tank may be deformed or the paint may be damaged due to excessive force. Therefore, it is forbidden to use a sledgehammer to knock the concrete accumulated in the bulk cement tank during the cleaning process, and only a chisel can be used.

    3). Regular maintenance and repair. When cement tanks are used in some sites, they are not maintained, and the color of the paint skin on the surface can not be recognized after a long time of erosion. Some users may think this is not important. In fact, it is not. The maintenance, repair, cleaning, lubrication and refueling of cement tanks can not be ignored, and the details that need to be paid attention to must be strictly implemented.

    Certificates:

    Specification

    Horizontal silo Dimension KW Volume
    50T 6000*2900*2580mm 7.5+5 25 m3
    80T 11300*2900*2580mm 11+5 50 m3
    100T 12100*2500*2800mm 11+7.5 60 m3

    Custom Containers FAQs

    Please get free consultant for your questions.

    We can customize the equipment like make bigger batch machine or silo,make higher discharge gate of silo.

    Yes, for example in China is 380v, 50Hz, in KSA is 380v, 60Hz, we have to adjust the motor accordingly.

    We normally use standard container to load the goods, sometimes use flat rack or Ro-Ro for truck pump these big size goods.

    Normally 30 to 40 days. If in  the peak of production the delivery of goods will more longer time.

    For our company payment term mainly is TT 30% deposit the balance money by copy of BL at sight and LC st sight. if you become our old client we also can do DP or OA 30 days.

    Yes, you can assign SGS/BV or others to inspect goods before shipment.

    Get Custom Quote

    Have a question? Get in touch instantly using the form below.
    Our customer support team would get back to you soon.

      Get Custom Quote